The $28,200 PEB Sourcing Mistake I Made—and the 12-Point Checklist I Built Afterward
Posted on 2026-11-06 by Jane Smith
A sourcing PM's account of a $28,200 overrun on a Johor warehouse—how treating pre-engineered and conventional steel buildings as interchangeable caused it, and the checklist that prevents it.
Continue reading